Revision history of "REQUALIFICAÇÃO DO JARDIM DR. MANUEL DA COSTA" (Q2877706)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

12 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 08:2508:25, 29 July 2022DG Regio talk contribs 42,909 bytes +25,947 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:5120:51, 7 July 2021DG Regio talk contribs 9,410 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:5109:51, 7 July 2021DG Regio talk contribs 8,979 bytes +1,259 Created claim: summary (P836): The operation aims to requalify the Dr. Manuel da Costa Garden, which marks the west entrance of the village, is at a strategic point of connection to the CP station. The operation aims to promote better conditions for the enjoyment of the Dr. Manuel da Costa Garden, through the requalification and diversification of the areas of stay and circulation and a greater articulation between the various aspects of use (commercial, leisure)., translated...

6 July 2021