Revision history of "Interior alteration, remodeling and adaptation of SCMM ERPI – 2nd Wing" (Q2875731)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

16 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 08:0308:03, 29 July 2022DG Regio talk contribs 42,717 bytes +26,562 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:5020:50, 7 July 2021DG Regio talk contribs 8,635 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 09:2809:28, 7 July 2021DG Regio talk contribs 8,204 bytes +131 Changed label, description and/or aliases in en: translated_label
  • curprev 09:2809:28, 7 July 2021DG Regio talk contribs 8,073 bytes +1,260 Created claim: summary (P836): This investment project is composed of a set of acquisitions of assets and services of various natures, but with the sole purpose of requalifying the building called the 2nd Wing, intended for the service of the ERPI of this institution.Simultaneously, to improve the energy efficiency of the entire complex, it is intended to install a UPAC system – electrical energy production unit for self-consumption, with solar/photovoltaic base., translated_...

6 July 2021