Revision history of "Basic School of Santa Iria_Tomar" (Q2871094)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

16 June 2023

12 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 06:4806:48, 29 July 2022DG Regio talk contribs 41,176 bytes +24,754 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 20:1020:10, 7 July 2021DG Regio talk contribs 9,420 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 08:4008:40, 7 July 2021DG Regio talk contribs 8,989 bytes +91 Changed label, description and/or aliases in en: translated_label
  • curprev 08:4008:40, 7 July 2021DG Regio talk contribs 8,898 bytes +1,190 Created claim: summary (P836): The present operation aims to replace the roofs of the buildings that are part of the Basic School of Santa Iria, coverings that are made of asbestos cement sheet in its composition, with a sandwich panel covering 50 mm thick. Given the risks posed by asbestos to public health, the proposed intervention is a priority, responding to a concern of the school community., translated_summary

6 July 2021

5 July 2021