Revision history of "Basic School of Turcifal" (Q2871072)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

16 June 2023

12 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 06:4806:48, 29 July 2022DG Regio talk contribs 38,109 bytes +22,548 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 19:5919:59, 7 July 2021DG Regio talk contribs 9,118 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 08:4008:40, 7 July 2021DG Regio talk contribs 8,687 bytes +83 Changed label, description and/or aliases in en: translated_label
  • curprev 08:4008:40, 7 July 2021DG Regio talk contribs 8,604 bytes +1,113 Created claim: summary (P836): The purpose of this application is the construction of the Turcifal Basic School in the municipality of Torres Vedras, equipment dedicated to pre-school education and the 1st cycle of basic education, intended to provide the parishes of Turcifal with better teaching and learning conditions., translated_summary

6 July 2021

5 July 2021