Revision history of "Requalification and Modernisation of the Integrated Basic School of Mira" (Q2871004)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

12 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 06:4606:46, 29 July 2022DG Regio talk contribs 43,072 bytes +26,065 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 19:5819:58, 7 July 2021DG Regio talk contribs 9,450 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1502:15, 7 July 2021DG Regio talk contribs 9,019 bytes +131 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1502:15, 7 July 2021DG Regio talk contribs 8,888 bytes +1,236 Created claim: summary (P836): The main objective of the project is the partial recovery of the cafeteria/canteen building, and block A, improving the conditions of hygiene, safety and accessibility required for students and teachers. It is aimed at an integral painting of the interior, placement of a new floor in classrooms and circulation, as well as new lighting and interior doors. He intends to equip a Snoezelen Room and the Living Room., translated_summary

6 July 2021

5 July 2021