Revision history of "REHABILITATION OF TONDELA SECONDARY SCHOOL PHASE 1" (Q2870983)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

12 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 06:4606:46, 29 July 2022DG Regio talk contribs 42,869 bytes +25,973 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

21 October 2021

13 September 2021

7 July 2021

  • curprev 19:5819:58, 7 July 2021DG Regio talk contribs 9,499 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 02:1402:14, 7 July 2021DG Regio talk contribs 9,068 bytes +109 Changed label, description and/or aliases in en: translated_label
  • curprev 02:1402:14, 7 July 2021DG Regio talk contribs 8,959 bytes +1,264 Created claim: summary (P836): The operation object of the application that is presented aims at the rehabilitation of the Secondary School of Tondela (Blocks C, C, E and F and adjacent exterior spaces), in order to fill the situations of material wear of the building, rectifying pathologies and mitigating the symptoms of evident degradation, but also, seeking to adapt the existing structures to the new needs that the concept of teaching, constantly changing, requires., trans...

6 July 2021

5 July 2021