Revision history of "Energy Efficiency Rio Maior – Public Lighting Equipment – Phase 2" (Q2866108)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

12 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 04:2904:29, 29 July 2022DG Regio talk contribs 43,170 bytes +26,236 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 20:3120:31, 6 July 2021DG Regio talk contribs 9,026 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 17:5117:51, 6 July 2021DG Regio talk contribs 8,593 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 17:5017:50, 6 July 2021DG Regio talk contribs 8,465 bytes +1,205 Created claim: summary (P836): The operation of interventions in public lighting systems to improve energy efficiency aims to replace the luminaires of less efficient technologies, such as mercury vapour and high pressure sodium vapour, with LED technology. Rational use of energy and energy-environmental efficiency in public buildings and equipment, in particular the optimisation of public lighting models (IP)., translated_summary
  • curprev 15:4215:42, 6 July 2021DG Regio talk contribs 7,260 bytes +515 Changed an Item: Edited by the infer coords bot - inferring coordinates from location

5 July 2021