Revision history of "Improvement of Energy Efficiency in the Building Headquarters of Cimbal II" (Q2866059)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

16 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 04:2804:28, 29 July 2022DG Regio talk contribs 41,918 bytes +25,829 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 17:3817:38, 6 July 2021DG Regio talk contribs 8,189 bytes +133 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3817:38, 6 July 2021DG Regio talk contribs 8,056 bytes +1,227 Created claim: summary (P836): The energy efficiency improvement measures covered by this application are summarised as follows: Intervention in the insulation of roofs, floors and walls, in the glazed surroundings with the replacement of frames, replacement of current lighting by LED systems, remodeling of HVAC systems, installation of a system of consumption management, solar thermal and photovoltaic system and auxiliary measures., translated_summary

5 July 2021