Revision history of "Pedestrian Public Access to the New Door of Treason" (Q2863418)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

12 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 03:2703:27, 29 July 2022DG Regio talk contribs 43,132 bytes +26,021 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:2915:29, 6 July 2021DG Regio talk contribs 9,129 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:3614:36, 6 July 2021DG Regio talk contribs 8,696 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:4613:46, 6 July 2021DG Regio talk contribs 8,197 bytes +110 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4613:46, 6 July 2021DG Regio talk contribs 8,087 bytes +1,290 Created claim: summary (P836): The pedestrian access to the Gate of Traction is integrated into the Requalification and Rehabilitation Project of the Public Space of the Évora Acropolis, which is articulated with the intervention in the Patio and Hermitage of S. Miguel, promoting pedestrian access. The intervention consists of the construction of a side walk and staircase along the S. Miguel Ramp and a clay path from the Gate of the Treason and on the rocky outcrop and repavi...

5 July 2021