Revision history of "Creation of the Park Mala in Rua de São Sebastião in Castro Verde" (Q2863355)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

12 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 03:2503:25, 29 July 2022DG Regio talk contribs 41,904 bytes +25,361 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:2915:29, 6 July 2021DG Regio talk contribs 9,037 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:3614:36, 6 July 2021DG Regio talk contribs 8,604 bytes +497 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:4513:45, 6 July 2021DG Regio talk contribs 8,107 bytes +126 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4513:45, 6 July 2021DG Regio talk contribs 7,981 bytes +1,221 Created claim: summary (P836): The present intervention consolidates a discarded urban building owned by the county with wax of 2,500 m², through the construction of a park park. It is intended to create conditions that seek to meet the needs of parks (due to the greater pedestrianisation) of the surrounding streets, and for this purpose the construction of an infrastructure that allows to accommodate about 70 parking spaces., translated_summary

5 July 2021