Revision history of "Cycling corridor of the parish of Quintinha – Alcácer do Sal" (Q2863235)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

12 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 03:2203:22, 29 July 2022DG Regio talk contribs 41,192 bytes +24,850 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:3815:38, 6 July 2021DG Regio talk contribs 8,998 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:3114:31, 6 July 2021DG Regio talk contribs 8,565 bytes +508 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:4413:44, 6 July 2021DG Regio talk contribs 8,057 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4413:44, 6 July 2021DG Regio talk contribs 7,935 bytes +1,188 Created claim: summary (P836): The Quintinha cyclable Corridor corresponds to the materialisation of the cyclable corridors pointed out for the “viabilisation of travels of a daily nature of the parish peripheral – parish of Quintinha and the riverside area/historic centre of the city, also boosting a more intense use of the cycling corridor already existing in the riverside zone Poente.”, translated_summary

5 July 2021