Revision history of "Requalification of the Basic and Secondary School Dr. João de Brito Camacho – Phase I" (Q2862831)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 03:1203:12, 29 July 2022DG Regio talk contribs 44,397 bytes +27,029 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 20:4220:42, 6 July 2021DG Regio talk contribs 9,184 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:0115:01, 6 July 2021DG Regio talk contribs 8,751 bytes +506 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:4013:40, 6 July 2021DG Regio talk contribs 8,245 bytes +147 Changed label, description and/or aliases in en: translated_label
  • curprev 13:4013:40, 6 July 2021DG Regio talk contribs 8,098 bytes +1,276 Created claim: summary (P836): It is intended to carry out the first phase of the requalification intervention of the Dr. João de Brito Camacho Basic and Secondary School (built in 1986). This intervention phase includes Class Block B, Entry/Ordinance, Outer Spaces and General Infrastructures and aims to address deficit situations in the building that presents greater problems and requalification of the general infrastructures that will serve as a connection between the build...

5 July 2021