Revision history of "Requalification of the Schools of the 1st Cycle of Basic Education and Portalegre Childhood Gardens – Phase 2" (Q2862767)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 03:1103:11, 29 July 2022DG Regio talk contribs 42,964 bytes +26,040 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 20:4120:41, 6 July 2021DG Regio talk contribs 9,055 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:0015:00, 6 July 2021DG Regio talk contribs 8,622 bytes +508 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 8,114 bytes +171 Changed label, description and/or aliases in en: translated_label
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 7,943 bytes +1,188 Created claim: summary (P836): This operation has as main objective the requalification of the Basic School of Alegrete, aiming at improving its operating conditions, comfort and safety. It is a centuries-old school that needs urgent intervention to solve the problems that exist, especially in terms of infiltration, thermal insulation (doors, shutters and windows), floors and outdoor furniture., translated_summary

5 July 2021