Revision history of "Remodeling and Modernisation of the Basic School No. 2 of Sines – 1st Phase" (Q2862760)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 03:1103:11, 29 July 2022DG Regio talk contribs 43,665 bytes +26,633 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 20:4120:41, 6 July 2021DG Regio talk contribs 9,082 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:0015:00, 6 July 2021DG Regio talk contribs 8,649 bytes +507 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 8,142 bytes +136 Changed label, description and/or aliases in en: translated_label
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 8,006 bytes +1,262 Created claim: summary (P836): The Operation aims to equip the School with conditions that increase the quality of education, filling the existing deficit situations in the building. The intervention aims to mitigate situations of degradation of school facilities at the level of construction, as well as the creation and adequacy of spaces, so as to adjust the school to existing needs, with a view to improving the conditions of habitability, comfort and functionality., transla...

5 July 2021