Revision history of "Expansion of the Basic School of the parish of Almeirim" (Q2862731)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 03:1103:11, 29 July 2022DG Regio talk contribs 42,177 bytes +25,540 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 17:2117:21, 6 July 2021DG Regio talk contribs 9,022 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:0015:00, 6 July 2021DG Regio talk contribs 8,589 bytes +507 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 8,082 bytes +114 Changed label, description and/or aliases in en: translated_label
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 7,968 bytes +1,234 Created claim: summary (P836): The school will benefit from the increase in its facilities that will accommodate new sanitary facilities for children, adults and disabled people, a covered playground, a cafeteria/polyvalent, a canopy, a locker room and a storage room. The outside space of the school will also benefit from the expansion through the creation of an outdoor covered space suitable for performing physical and playful activities., translated_summary

5 July 2021