Revision history of "Integrated intervention to remove fibrocement coverages" (Q2862696)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 03:1003:10, 29 July 2022DG Regio talk contribs 41,813 bytes +25,326 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 17:2017:20, 6 July 2021DG Regio talk contribs 8,919 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:5914:59, 6 July 2021DG Regio talk contribs 8,486 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:3713:37, 6 July 2021DG Regio talk contribs 7,987 bytes +114 Changed label, description and/or aliases in en: translated_label
  • curprev 13:3713:37, 6 July 2021DG Regio talk contribs 7,873 bytes +1,206 Created claim: summary (P836): This is an operation aimed at the execution of conservation works and replacement of existing coverage, without changing the response to the two levels of education and teaching of preschool and 1st cycle. This integrated intervention is located in 5 school buildings, namely: Ji Freguesia Santo António, EB Horta das Figueiras, EB Vista Alegre, EB Frei Aleixo and EB Cruz da Picada., translated_summary

5 July 2021