Revision history of "St. Teotónio’s School Center" (Q2862675)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

12 June 2023

23 May 2023

5 November 2022

29 July 2022

  • curprev 03:1003:10, 29 July 2022DG Regio talk contribs 42,630 bytes +25,903 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 17:2017:20, 6 July 2021DG Regio talk contribs 9,006 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 15:1115:11, 6 July 2021DG Regio talk contribs 8,573 bytes +507 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:3613:36, 6 July 2021DG Regio talk contribs 8,066 bytes +90 Changed label, description and/or aliases in en: translated_label
  • curprev 13:3613:36, 6 July 2021DG Regio talk contribs 7,976 bytes +1,266 Created claim: summary (P836): The project provides for the construction of 8 classrooms, 3 multipurpose rooms, library and various facilities to support the operation of the equipment as well as play areas outside and a covered porch, is located at the highest level of the enclosure where EB 2.3 is installed, sock walls with the sports pavilion and develops on 2 floors, with only the upper floor visible from the street bordering north, through which access will be made., tra...

5 July 2021