Revision history of "Urban requalification of the Largo das Portas and Rua Dr. Alves Moreira" (Q2859735)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

12 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 02:1202:12, 29 July 2022DG Regio talk contribs 43,819 bytes +26,721 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:2415:24, 6 July 2021DG Regio talk contribs 9,108 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:2014:20, 6 July 2021DG Regio talk contribs 8,675 bytes +515 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:0313:03, 6 July 2021DG Regio talk contribs 8,160 bytes +130 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0313:03, 6 July 2021DG Regio talk contribs 8,030 bytes +1,283 Created claim: summary (P836): The present operation consists of the requalification of one of the main access routes to the center of Castro Marim and its surrounding public space. The intervention focuses on the revival of Dr. José Alves Moreira Street, and still partially from the streets of the Combatants of the Great War and April 25, as well as the requalification of Largo das Portas. It will allow a better accessibility for motorists and pedestrians, with more safety a...

5 July 2021