Revision history of "Requalification of pedestrian paths in the connection between Vila da Luz and the Four Roads (EN 125)" (Q2857615)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

12 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 02:1102:11, 29 July 2022DG Regio talk contribs 42,091 bytes +25,498 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:2415:24, 6 July 2021DG Regio talk contribs 8,990 bytes +433 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:2014:20, 6 July 2021DG Regio talk contribs 8,557 bytes +508 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 13:0213:02, 6 July 2021DG Regio talk contribs 8,049 bytes +161 Changed label, description and/or aliases in en: translated_label
  • curprev 13:0213:02, 6 July 2021DG Regio talk contribs 7,888 bytes +1,188 Created claim: summary (P836): The present operation aims to requalify the EM 537 road between Vila da Luz and the Four Roads, a section belonging to the Algarve Coastal Ecovia LGS3, a road that presents weaknesses of use, without accessibility or safety conditions, with the creation of pedestrian walk and requalification of the road with the introduction of a shared road for cars and bicycles., translated_summary

5 July 2021