Revision history of "Upgrading of EBI de Capelas facilities" (Q2854626)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

16 June 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:4001:40, 29 July 2022DG Regio talk contribs 43,369 bytes +26,368 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 14:4314:43, 6 July 2021DG Regio talk contribs 9,023 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0614:06, 6 July 2021DG Regio talk contribs 8,598 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4812:48, 6 July 2021DG Regio talk contribs 8,098 bytes +97 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4812:48, 6 July 2021DG Regio talk contribs 8,001 bytes +1,256 Created claim: summary (P836): Upgrading and upgrading most of the buildings and buildings in the school complex, increasing its capacity with the construction of new buildings, allowing the increase in normal classrooms, the creation of new rooms equipped and prepared for practical classes in some specific disciplines, enabling some of the existing areas to be restructured, such as the kitchen and the library, providing them with more space, better and better., translated_su...

5 July 2021