Revision history of "Expansion and Rehabilitation of the EB/JI School of Miracles" (Q2854621)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

14 November 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:4001:40, 29 July 2022DG Regio talk contribs 43,688 bytes +26,530 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 14:4314:43, 6 July 2021DG Regio talk contribs 9,079 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0614:06, 6 July 2021DG Regio talk contribs 8,654 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4812:48, 6 July 2021DG Regio talk contribs 8,154 bytes +119 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4812:48, 6 July 2021DG Regio talk contribs 8,035 bytes +1,284 Created claim: summary (P836): The present application aims to expand the EB/JI school of Miracles, in Ponta Delgada, which includes the construction of a new building composed of a single floor and connected to the existing one, thus allowing the movement and access all areas inside it and with various connections to the outside including that of people with mobility conditioned to the majority of the school space. The rehabilitation of the building is also integrated in the...

5 July 2021