Revision history of "Construction of Flemish Day Centre" (Q2854189)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:3301:33, 29 July 2022DG Regio talk contribs 41,407 bytes +24,993 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:2315:23, 6 July 2021DG Regio talk contribs 8,902 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:3913:39, 6 July 2021DG Regio talk contribs 8,477 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4412:44, 6 July 2021DG Regio talk contribs 7,978 bytes +93 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4412:44, 6 July 2021DG Regio talk contribs 7,885 bytes +1,231 Created claim: summary (P836): The present phase was preceded by the elaboration and consolidation of the Base Program and the Preliminary Study, in its various options, which, in general terms, characterises the current claim as the expansion of the daycare center to accommodate the Day Center, in which the common spaces of management/direction and services (staff, laundry and kitchen) were performed in the 1 phase of the intervention., translated_summary

5 July 2021