Revision history of "Creation of the Maia Elderly Support Centre" (Q2854147)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

16 June 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:3201:32, 29 July 2022DG Regio talk contribs 43,357 bytes +26,578 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:2215:22, 6 July 2021DG Regio talk contribs 9,047 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 13:3813:38, 6 July 2021DG Regio talk contribs 8,622 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4712:47, 6 July 2021DG Regio talk contribs 8,122 bytes +102 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4712:47, 6 July 2021DG Regio talk contribs 8,020 bytes +1,276 Created claim: summary (P836): The project was granted according to a linear intervention line that creates a certain spatial fluidity, in a pre-existing building that had some constraints.In the development of the project, the design criteria were always very clear, since there was a strict program to comply with.In the field in question, there is a construction that will undergo further changes and adaptations to the existing legislation regulating the construction of equip...

5 July 2021