Revision history of "Intervention in the Terrestrial Logistic Circuits of the Third? Rehabilitation and Benefit of the Sections of the Circular of Angra do Heroísmo and the Ramal of E.R. 1-1.ª access to the Port of Cinco Ribeiras" (Q2854035)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2901:29, 29 July 2022DG Regio talk contribs 46,339 bytes +28,267 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:1615:16, 6 July 2021DG Regio talk contribs 9,428 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 9,003 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4412:44, 6 July 2021DG Regio talk contribs 8,503 bytes +270 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4412:44, 6 July 2021DG Regio talk contribs 8,233 bytes +1,299 Created claim: summary (P836): The project includes the components of construction and price revision of the construction of the Intervention contract in Terrestrial Logistic Circuits of Terceira – Rehabilitation and Benefit of the sections of the Circular of Angra do Heroísmo and the Branch of E. R. No. 1-1ª of access to the Port of Cinco Ribeiras, which translates into the rehabilitation of the road pavement, by milling the existing pavement in bituminous, regularisation an...

5 July 2021