Revision history of "Intervention in the interconcelhia link Povoação – Northeast, Rehabilitation of the section of ER 1-1ª, between Garcias and Retorta Water (from Km 3.2 to Km 7.6)" (Q2854033)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2901:29, 29 July 2022DG Regio talk contribs 43,310 bytes +26,263 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:1615:16, 6 July 2021DG Regio talk contribs 9,128 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 8,703 bytes +508 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4412:44, 6 July 2021DG Regio talk contribs 8,195 bytes +226 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4412:44, 6 July 2021DG Regio talk contribs 7,969 bytes +1,179 Created claim: summary (P836): The operation consists of an intervention of a section of the Regional Road No. 1-1.ª, in the municipality of the Northeast, between Água Retorta and Garcias, with 4,4 km in length and a width of 5,60 m, integrating, in general, paving, vertical and horizontal road signs, as well as the installation of safety guards throughout the area to be intervened., translated_summary

5 July 2021