Revision history of "Intervention in the Land Logistic Circuits of São Jorge? Rehabilitation and Benefit of a section of Regional Road No. 1? 2nd, on the extension of access to Fajã do Ouvidor" (Q2854029)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

16 June 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2901:29, 29 July 2022DG Regio talk contribs 44,033 bytes +26,655 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 17:4917:49, 6 July 2021DG Regio talk contribs 9,200 bytes +233 Changed label, description and/or aliases in en: translated_label
  • curprev 17:4917:49, 6 July 2021DG Regio talk contribs 8,967 bytes +1,214 Created claim: summary (P836): Does the project contemplate the construction and price revision components of the construction of the Intervention contract in the Land Logistic Circuits of São Jorge? Rehabilitation and Benefit of a section of Regional Road No. 1? 2nd, in the extension of access to Fajã do Ouvidor, which translates into the rehabilitation of the road pavement and the improvement of the drainage system., translated_summary
  • curprev 15:1615:16, 6 July 2021DG Regio talk contribs 7,753 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 7,328 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location

5 July 2021