Revision history of "Upgrading of a section of ER No. 3-2ª of the island of Pico (longitudinal road), between km 12,33 and km 22,99" (Q2854025)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

14 November 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2901:29, 29 July 2022DG Regio talk contribs 44,142 bytes +26,782 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:1615:16, 6 July 2021DG Regio talk contribs 9,207 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 8,782 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4312:43, 6 July 2021DG Regio talk contribs 8,282 bytes +171 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4312:43, 6 July 2021DG Regio talk contribs 8,111 bytes +1,270 Created claim: summary (P836): The E.R.N.º 3-2ª, develops between Vila da Madalena and km 10.5 of E.R.N.º 2-2ª(Transversal), an extension of 23.1 kilometres. The section to be rehabilitated begins at km12,33 and extends to km22,99, for a total length of 10.66 km. The intervention consists of regularisations, application of bituminous carpet, construction of absorbent well for rainwater sinking and floor paintings, as well as the construction of a support wall in concrete, tra...

5 July 2021