Revision history of "Intervention in the interconcelhia link Povoação – Northeast, Rehabilitation of the section of ER 1-1ª, between Garcias and Retorta Water (from Km 0.00 to Km 3.2)" (Q2854021)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

14 November 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2901:29, 29 July 2022DG Regio talk contribs 42,244 bytes +26,377 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 12:4312:43, 6 July 2021DG Regio talk contribs 7,874 bytes +227 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4312:43, 6 July 2021DG Regio talk contribs 7,647 bytes +1,193 Created claim: summary (P836): The operation consists of an intervention of a section of the Regional Road No. 1-1.ª, in the municipalities of Povoação and Northeast, between Água Retorta and Garcias, with 3,2 km in length and a width of 5,60 m, integrating, in general, paving work, vertical and horizontal road signs, as well as the installation of safety guards throughout the area to intervene., translated_summary

5 July 2021