Revision history of "Pumping control and management system for groundwater capture" (Q2853959)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2801:28, 29 July 2022DG Regio talk contribs 43,673 bytes +26,672 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:1515:15, 6 July 2021DG Regio talk contribs 9,056 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0014:00, 6 July 2021DG Regio talk contribs 8,631 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4212:42, 6 July 2021DG Regio talk contribs 8,132 bytes +120 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4212:42, 6 July 2021DG Regio talk contribs 8,012 bytes +1,268 Created claim: summary (P836): The control and management system of pumping in groundwater collection once installed and operational will allow automated operational control of infrastructure. Through sensorisation and automation, the system will allow you to have knowledge at a distance of the state of the installations in real time. Automated control of the installations may be carried out by means of remote control in the container of destination of the extracted flows., t...

5 July 2021