Revision history of "Rehabilitation, Enlargement and Modernisation of the Magdalene Water Supply Network" (Q2853929)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

14 November 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2701:27, 29 July 2022DG Regio talk contribs 43,952 bytes +26,678 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:1515:15, 6 July 2021DG Regio talk contribs 9,085 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0014:00, 6 July 2021DG Regio talk contribs 8,660 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4212:42, 6 July 2021DG Regio talk contribs 8,160 bytes +142 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4212:42, 6 July 2021DG Regio talk contribs 8,018 bytes +1,249 Created claim: summary (P836): The operation consists of a series of interventions to be carried out in the public water supply network to optimise the municipality’s water resources and infrastructures associated with its operation. In this sense, the following interventions are justified in order to combat water waste: Replacement of problematic sections where significant losses occur due to insufficient pipe capacity (part 02, section 26) waterproof, translated_summary

5 July 2021