Revision history of "Refurbishment and expansion of AHBV’s facilities in Santa Maria" (Q2853824)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

16 June 2023

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2601:26, 29 July 2022DG Regio talk contribs 42,854 bytes +25,987 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:0815:08, 6 July 2021DG Regio talk contribs 9,079 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 8,654 bytes +507 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4112:41, 6 July 2021DG Regio talk contribs 8,147 bytes +124 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4112:41, 6 July 2021DG Regio talk contribs 8,023 bytes +1,216 Created claim: summary (P836): The project has been planned and designed to improve the level of protection of existing installations and material resources, depending on the different disaster scenarios likely to occur, giving priority to car park conditions and the storage of intervention equipment in covered space, so as to effectively mitigate all constraints on the safety and operationality of the means of transport., translated_summary

5 July 2021