Revision history of "Protection and requalification of the coastline in Porto Pim and the Port of Feteira" (Q2853779)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

11 June 2023

23 May 2023

9 November 2022

29 July 2022

  • curprev 01:2501:25, 29 July 2022DG Regio talk contribs 43,142 bytes +26,064 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:0715:07, 6 July 2021DG Regio talk contribs 9,123 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 8,698 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4112:41, 6 July 2021DG Regio talk contribs 8,199 bytes +143 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4112:41, 6 July 2021DG Regio talk contribs 8,056 bytes +1,286 Created claim: summary (P836): The present project includes two interventions on the island of Faial, with a view to coastal protection, in particular at the Port of Pim and the Port of Feteira. The first intervention consists of the repair of the locations and the execution of a protection adherent to the wall, through the execution of a single-range screwing prism of 10 to 20 kN, based on the natural terrain adherent to the existing wall.The second intervention consists of...

5 July 2021