Revision history of "Cycle path integrated into the Central Unit section of the Urban Requalification project of the Sea Front of the City of Horta" (Q2853735)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

16 June 2023

11 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 01:2501:25, 29 July 2022DG Regio talk contribs 44,869 bytes +27,552 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:0715:07, 6 July 2021DG Regio talk contribs 9,173 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 8,748 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:4012:40, 6 July 2021DG Regio talk contribs 8,249 bytes +186 Changed label, description and/or aliases in en: translated_label
  • curprev 12:4012:40, 6 July 2021DG Regio talk contribs 8,063 bytes +1,272 Created claim: summary (P836): This project seeks to encourage the use of bicycles in this area of the city and to increase the modes of smooth mobility in the territory. With this intervention in the public space and with the pedestrian valorisation of the axis of the marginal, throughout its extension, it is proposed a cyclable route that assumes two typologies:In front of the Fort of Santa Cruz the cyclable tracks are integrated into the road, paved in basalt cement plates...

5 July 2021