Revision history of "Renewable Energy Storage Cells – São Miguel Island" (Q2853703)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

11 June 2023

23 May 2023

8 November 2022

29 July 2022

  • curprev 01:2401:24, 29 July 2022DG Regio talk contribs 42,826 bytes +25,911 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

18 December 2021

13 December 2021

4 December 2021

22 October 2021

13 September 2021

7 July 2021

6 July 2021

  • curprev 15:0715:07, 6 July 2021DG Regio talk contribs 9,060 bytes +425 Changed an Item: Edited by the materialized bot - inferring region from the coordinates
  • curprev 14:0114:01, 6 July 2021DG Regio talk contribs 8,635 bytes +500 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 12:3712:37, 6 July 2021DG Regio talk contribs 8,135 bytes +112 Changed label, description and/or aliases in en: translated_label
  • curprev 12:3712:37, 6 July 2021DG Regio talk contribs 8,023 bytes +1,255 Created claim: summary (P836): The operation consists of the installation of the Energy Storage System, having chosen the location next to the substation of Caldeirão, where EDA has its own land, on the other hand, it is the best location considering its proximity to the main consumption centers.On the other hand, there is the advantage of reducing losses, with the possibility of injection/consumption of reactive power, made available by the System of Storage, translated_summary

5 July 2021