Revision history of "‘CENTRE OF RISK ASSESSMENT AND RESISTIVITY OF THE HFC REGIONAL CAPITAL’" (Q2822569)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 20:4220:42, 10 October 2024DG Regio talk contribs 56,513 bytes 0 Changed label, description and/or aliases in pt
  • curprev 20:4220:42, 10 October 2024DG Regio talk contribs 56,513 bytes −2 Set a claim value: summary (P836): O objetivo do CEDIAK-BAMT é reforçar a excelência e as prioridades horizontais e verticais das RIS3 da região AMT, através do desenvolvimento de uma infraestrutura moderna e inovadora para a avaliação do risco e da resiliência do capital das RIS3 em áreas de interesse na região HMT. A infraestrutura KEDIAK BAMTH é composta por um centro de controlo que disporá dos sistemas modernos necessários para que os cidadãos e as empresas da região AMT disponh...

20 March 2024

19 June 2023

11 June 2023

29 July 2022

  • curprev 00:0400:04, 29 July 2022DG Regio talk contribs 55,790 bytes +34,827 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

17 December 2021

7 December 2021

30 November 2021

  • curprev 13:2213:22, 30 November 2021DG Regio talk contribs 12,917 bytes +1,895 Created claim: summary (P836): L’objectif de KEDIAC-PAMTH est de renforcer l’excellence et les priorités horizontales et verticales RIS3 de la région AMTH par le développement d’une infrastructure moderne et innovante pour évaluer le risque et la résilience du capital RIS3 dans les zones d’intérêt dans la région d’Aristote. L’infrastructure KEDIAK PAMTH se compose d’un centre de contrôle qui disposera des systèmes modernes nécessaires pour garantir aux citoyens et aux entrepr...
  • curprev 13:2213:22, 30 November 2021DG Regio talk contribs 11,022 bytes +125 Changed label, description and/or aliases in fr: translated_label

27 September 2021

6 July 2021

  • curprev 08:2708:27, 6 July 2021DG Regio talk contribs 11,317 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 05:1105:11, 6 July 2021DG Regio talk contribs 10,886 bytes +134 Changed label, description and/or aliases in en: translated_label
  • curprev 05:1105:11, 6 July 2021DG Regio talk contribs 10,752 bytes +1,769 Created claim: summary (P836): The aim of CEDIAK-BAMT is to strengthen the excellence and horizontal and vertical RIS3 priorities of the AMT region, through the development of a modern and innovative infrastructure for the assessment of the risk and resilience of RIS3 capital in areas of interest in the HMT region. The infrastructure KEDIAK BAMTH is composed of a control centre that will have the modern systems required for the citizens and businesses of the AMT region to hav...

1 July 2021