Revision history of "Normalisation of the existing single railway line isthmus" (Q2822248)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 09:0509:05, 10 October 2024DG Regio talk contribs 38,815 bytes 0 Set a claim value: summary (P836): Após a conclusão do projeto, a reabertura do troço ferroviário Isthmus – Loutraki com eletrificação e em combinação com as outras tarefas do troço (sistemas automáticos de passagem de nível – ASD, etc.) será alcançada maximizando a segurança, o conforto e a capacidade da rede.

12 March 2024

9 June 2023

28 July 2022

  • curprev 23:5923:59, 28 July 2022DG Regio talk contribs 38,090 bytes +23,104 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

17 December 2021

7 December 2021

30 November 2021

  • curprev 13:1713:17, 30 November 2021DG Regio talk contribs 9,971 bytes +1,114 Created claim: summary (P836): À l’issue du projet, le tronçon ferroviaire Isthmus — Loutraki sera rouvert par électromobilité et en liaison avec le reste des travaux de la section (Automatic Level Passage Systems — ASID, etc.), ce qui maximisera la sécurité, le confort et la capacité de transport du réseau., translated_summary
  • curprev 13:1713:17, 30 November 2021DG Regio talk contribs 8,857 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 September 2021

6 July 2021

5 July 2021

  • curprev 18:5218:52, 5 July 2021DG Regio talk contribs 8,722 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 18:5218:52, 5 July 2021DG Regio talk contribs 8,606 bytes +1,108 Created claim: summary (P836): Upon completion of the project, the reopening of the railway section Isthmus – Loutraki with electrification and in combination with the other tasks in the section (Automatic Level Passage Systems – ASD, etc.) will be achieved maximising safety, comfort and capacity of the network., translated_summary

1 July 2021