Revision history of "CLOSURE OF A CIRRH WASTEWATER NETWORK" (Q2821539)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 23:1623:16, 8 October 2024DG Regio talk contribs 45,257 bytes +14 Set a claim value: summary (P836): Este projeto completa a infraestrutura de recolha de águas residuais de Kirra, que forma um único conjunto residencial com Itea (assentamento prioritário) e é modernizado – as instalações de tratamento de águas residuais de Itea estão a ser alargadas para cobrir as necessidades das povoações de Itea e Kirra e, por outro lado, para alcançar as características de saída de qualidade previstas na Diretiva 91/271/CEE. O projeto contribui igualmente para...

7 March 2024

9 June 2023

28 July 2022

  • curprev 23:4723:47, 28 July 2022DG Regio talk contribs 44,518 bytes +27,504 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

17 December 2021

7 December 2021

30 November 2021

  • curprev 13:0713:07, 30 November 2021DG Regio talk contribs 11,001 bytes +1,458 Created claim: summary (P836): Ce projet complète l’infrastructure de collecte des eaux usées de Kirra, qui est un complexe résidentiel unique avec Itea (établissement prioritaire C) et améliore et étend les stations d’épuration des eaux usées d’Itea afin de répondre aux besoins d’Itea et Kirras et d’atteindre les caractéristiques de qualité de production prévues par la directive 91/271/CEE. Les interventions du projet contribuent également au démantèlement du système d’évacu...
  • curprev 13:0713:07, 30 November 2021DG Regio talk contribs 9,543 bytes +104 Changed label, description and/or aliases in fr: translated_label

27 September 2021

6 July 2021

5 July 2021

  • curprev 18:4018:40, 5 July 2021DG Regio talk contribs 9,428 bytes +96 Changed label, description and/or aliases in en: translated_label
  • curprev 18:4018:40, 5 July 2021DG Regio talk contribs 9,332 bytes +1,346 Created claim: summary (P836): This project completes the sewage collection infrastructure of Kirra, which forms a single residential whole with Itea (priority settlement) and upgraded – the Itea sewage treatment facilities are being extended to cover the needs of the settlements of Itea and Kirra and on the other to achieve the quality exit characteristics provided for in Directive 91/271/EEC. The project also contributes to the abolition of the sewage disposal system throug...

1 July 2021