Revision history of "Extension of Piraeus port for the service of the cruise" (Q2808785)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

19 June 2023

10 June 2023

28 July 2022

  • curprev 19:3519:35, 28 July 2022DG Regio talk contribs 41,280 bytes +25,408 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

6 December 2021

30 November 2021

  • curprev 07:3807:38, 30 November 2021DG Regio talk contribs 10,390 bytes +1,306 Created claim: summary (P836): Le projet concerne l’expansion du port de passagers du Pirée avec la construction de deux nouveaux jets qui permettront le paradigme des bateaux de croisière «nouvelle génération» d’une longueur de plus de 280 m. Il comprend la construction d’infrastructures de base comprenant des projecteurs d’environ 2 300 m de longueur, une surface de terrain de 150,000 m² et des réseaux de drainage d’eau, de fibres optiques et d’alimentation en électricité e...
  • curprev 07:3807:38, 30 November 2021DG Regio talk contribs 9,084 bytes +115 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

  • curprev 19:4819:48, 5 July 2021DG Regio talk contribs 9,389 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 11:5011:50, 5 July 2021DG Regio talk contribs 8,958 bytes +114 Changed label, description and/or aliases in en: translated_label
  • curprev 11:5011:50, 5 July 2021DG Regio talk contribs 8,844 bytes +1,233 Created claim: summary (P836): The project concerns the expansion of the passenger port of Piraeus with the construction of two new piers that will allow the comparison of “new generation” cruise ships with a length of more than 280 m. It includes the construction of basic infrastructure including piercings approximately 2300 m long, a land area of 150.000 m² and water drainage networks, fiber optic and power supply and water supply., translated_summary

1 July 2021