Revision history of "PORT OF PISAET ITHACA" (Q2790515)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:3408:34, 10 October 2024DG Regio talk contribs 41,532 bytes +8 Set a claim value: summary (P836): O objeto natural do projeto diz respeito à construção do porto de Pisaet, em Ithaca, uma vez que o cais existente, que serve atualmente a ligação costeira da ilha com a Cefalónia e a Grécia continental, satisfaz as necessidades existentes a um nível mínimo e marginal. Esta infraestrutura portuária inclui, para além da instalação de atracagem, o edifício dos serviços portuários, as instalações E/M e o acesso rodoviário.

23 March 2024

12 June 2023

11 July 2022

  • curprev 09:0009:00, 11 July 2022DG Regio talk contribs 40,799 bytes +24,541 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 19:1419:14, 29 November 2021DG Regio talk contribs 10,891 bytes +1,293 Created claim: summary (P836): L’objet naturel du projet, concerne essentiellement la construction du port de Pisaetos d’Ithaque, puisque la jetée existante qui dessert actuellement la liaison ferry de l’île avec la Céphalonie et la Grèce continentale, couvre de manière minime et marginale les besoins existants. Cette infrastructure portuaire comprend — en plus de l’installation d’amarrage — le bâtiment de service portuaire, les installations électriques et l’accès routier.,...
  • curprev 19:1419:14, 29 November 2021DG Regio talk contribs 9,598 bytes +80 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

3 July 2021

  • curprev 01:0901:09, 3 July 2021DG Regio talk contribs 9,507 bytes +80 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0901:09, 3 July 2021DG Regio talk contribs 9,427 bytes +1,221 Created claim: summary (P836): The Natural Object of the project concerns the construction of the Pisaet Port of Ithaca, since the existing pier that currently serves the coastal connection of the island with Kefalonia and mainland Greece, meets the existing needs to a minimum and marginally. This port infrastructure includes – in addition to the docking facility – the port service building, E/M facilities and road access., translated_summary

1 July 2021

23 June 2021