Revision history of "EXTENSION OF A SPECIAL KERKYRA LAW" (Q2790513)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 20:5420:54, 7 October 2024DG Regio talk contribs 53,754 bytes +14 Changed label, description and/or aliases in pt
  • curprev 20:5420:54, 7 October 2024DG Regio talk contribs 53,740 bytes −22 Set a claim value: summary (P836): O projeto diz respeito à construção de um porto para assegurar a comunicação marítima e a aproximação de embarcações turísticas em Erikousa Corfu. O projeto terá início em 2016 e será concluído e entregue para utilização em 31-12-2018. De 160/00/2 do anexo do Acordo 160/00/CE e de 160/00 de 160.00.2 da presente decisão, incluindo a construção de um edifício de 200 m2 e de 160.00.2 da presente decisão, incluindo a construção de um edifício de 50 m2 e...

22 March 2024

12 June 2023

28 July 2022

  • curprev 14:2414:24, 28 July 2022DG Regio talk contribs 53,037 bytes +26,423 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 19:1419:14, 29 November 2021DG Regio talk contribs 15,281 bytes +2,813 Created claim: summary (P836): Le projet concerne la construction d’un port pour assurer la communication maritime et l’approche des navires touristiques à Erikoussa Corfou. Le projet débutera en 2016 et sera achevé et livré pour utilisation le 31 décembre 2018. Le lisier comprend 7 sous-projets énumérés ci-dessous: «Expansion du port d’Ereikoussa», qui comprend a) la construction d’une jetée bobinée d’environ 200 m de long, b) la reconstruction d’une sous-couche de longueur...
  • curprev 19:1419:14, 29 November 2021DG Regio talk contribs 12,468 bytes +86 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

3 July 2021

  • curprev 01:0901:09, 3 July 2021DG Regio talk contribs 12,371 bytes +93 Changed label, description and/or aliases in en: translated_label
  • curprev 01:0901:09, 3 July 2021DG Regio talk contribs 12,278 bytes +1,333 Created claim: summary (P836): The project concerns the construction of a port to ensure maritime communication and the approach of tourist boats in Erikousa Corfu.The project will begin in 2016 and will be completed and delivered for use on 31-12-2018. Of 160/00/2 of the Annex to the Agreement 160/00/EC and of 160/00 of 160/00 of 160.00.2 of this Decision, including the building of a building of 200 m² and of 160.00.2 of this Decision, including the construction of a buildin...

1 July 2021

23 June 2021