Revision history of "Construction" (Q2782856)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

9 June 2023

5 January 2023

28 July 2022

  • curprev 12:3812:38, 28 July 2022DG Regio talk contribs 43,369 bytes +26,056 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 14:5214:52, 29 November 2021DG Regio talk contribs 11,418 bytes +1,476 Created claim: summary (P836): Le projet concerne la réfection de la route de Kallonis-Sigri Lesvos, d’une longueur de 46,7 km, et comprend:a) l’amélioration par tronçons, sur une longueur totale d’environ 21 km, de la route existante, par l’amélioration de ses caractéristiques géométriques.b) La construction de nouveaux tronçons, d’une longueur d’environ 25,7 km. En outre, des dispositions sont prévues pour les expropriations nécessaires, les travaux de relocalisation et de...
  • curprev 14:5214:52, 29 November 2021DG Regio talk contribs 9,942 bytes +71 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 18:1618:16, 2 July 2021DG Regio talk contribs 9,860 bytes +71 Changed label, description and/or aliases in en: translated_label
  • curprev 18:1618:16, 2 July 2021DG Regio talk contribs 9,789 bytes +1,363 Created claim: summary (P836): The project concerns the upgrading of the Kalloni-Sigrio Lesvos road axis, with a length of 46.7 km, and includes:(a) The improvement in parts, over a total length of approximately 21 km, of the existing road, with an upgrade of its geometrical characteristics.b) The construction of new sections over a length of approximately 25.7 km.Also, the required expropriation, displacement work – restoration of networks of Public Benefit Organisations, ar...

30 June 2021

22 June 2021