Revision history of "STUDIES ON THE INTEGRATED MANAGEMENT OF HEALTH CARE SYSTEMS" (Q2782738)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 07:4707:47, 11 October 2024DG Regio talk contribs 47,241 bytes +12 Changed label, description and/or aliases in pt
  • curprev 07:4707:47, 11 October 2024DG Regio talk contribs 47,229 bytes +27 Set a claim value: summary (P836): O projeto diz respeito à maturação e à execução efetiva das ações previstas no âmbito do projeto «Gestão integrada da água na zona de Asopos». Para o efeito, são realizados estudos técnicos e de apoio em todas as fases, na sequência das questões do Leilão das intervenções propostas.Estas intervenções consistem na construção de projetos destinados a fontes alternativas de abastecimento de água às indústrias e áreas urbanas do Município de Tanagra e n...

22 March 2024

9 June 2023

5 January 2023

28 July 2022

  • curprev 12:3812:38, 28 July 2022DG Regio talk contribs 46,975 bytes +28,733 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 14:4714:47, 29 November 2021DG Regio talk contribs 11,828 bytes +1,529 Created claim: summary (P836): Le projet concerne la maturité et la mise en œuvre effective des actions prévues dans le cadre du projet «Gestion intégrée des systèmes d’eau de la zone d’Asopos». À cette fin, des études techniques et d’appui doivent être réalisées à tous les stades, à la suite des documents d’appel d’offres pour les interventions proposées, à savoir la construction de projets visant à fournir des sources alternatives d’approvisionnement en eau aux industries e...
  • curprev 14:4714:47, 29 November 2021DG Regio talk contribs 10,299 bytes +137 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 17:3117:31, 2 July 2021DG Regio talk contribs 10,151 bytes +118 Changed label, description and/or aliases in en: translated_label
  • curprev 17:3117:31, 2 July 2021DG Regio talk contribs 10,033 bytes +1,440 Created claim: summary (P836): The project concerns the maturation and effective implementation of planned actions of the project “Integrated Water Management of Asopos Area”. For this purpose, technical and supportive studies are carried out at all stages, following the Auction issues of the proposed interventions.These interventions consist of the construction of projects aimed at alternative sources of water supply to the industries and urban areas of the Municipality of T...

30 June 2021

22 June 2021