Revision history of "Upgrading of the 3rd, 4th and 3rd Gymnasium of Mytiline Municipal Mytilene School" (Q2782404)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 22:5222:52, 8 October 2024DG Regio talk contribs 40,619 bytes −5 Changed label, description and/or aliases in pt
  • curprev 22:5222:52, 8 October 2024DG Regio talk contribs 40,624 bytes +9 Set a claim value: summary (P836): O projeto diz respeito à modernização do complexo escolar «Tecelagem», ou seja, a 3.a e 4.a Escolas Secundárias e a 3.a Escola Secundária do município de Mytilene, Lesbos. Serão realizados trabalhos de modernização e modernização em todos os edifícios do complexo escolar, a fim de o tornar operacional – seguro e satisfazer as novas necessidades e exigências do período.

7 March 2024

11 June 2023

5 January 2023

28 July 2022

  • curprev 12:3412:34, 28 July 2022DG Regio talk contribs 40,387 bytes +24,333 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 13:1113:11, 29 November 2021DG Regio talk contribs 10,780 bytes +1,164 Created claim: summary (P836): Le projet concerne la modernisation du complexe scolaire «Tissages», c’est-à-dire les 3e, 4e et 3e gymnases de la municipalité de Mytilene de Lesvos. Tous les bâtiments du complexe scolaire doivent être rénovés et modernisés afin de le rendre opérationnel — sûr et de répondre aux nouveaux besoins et exigences de l’époque., translated_summary
  • curprev 13:1113:11, 29 November 2021DG Regio talk contribs 9,616 bytes +168 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 17:1117:11, 2 July 2021DG Regio talk contribs 9,437 bytes +140 Changed label, description and/or aliases in en: translated_label
  • curprev 17:1117:11, 2 July 2021DG Regio talk contribs 9,297 bytes +1,176 Created claim: summary (P836): The project concerns the upgrading of the school complex “Weaving”, i.e. the 3rd, 4th High School and the 3rd High School of Mytilene Municipality of Lesvos. Upgrading and modernisation work will be carried out in all the buildings of the school complex, in order to make it operational – safe and meet the new needs and requirements of the period., translated_summary

30 June 2021

22 June 2021