Revision history of "MODERNISATION AND OPERATIONAL UPGRADING OF THE NEW TOWN COUNCIL" (Q2782342)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

12 June 2023

5 January 2023

11 July 2022

  • curprev 07:4907:49, 11 July 2022DG Regio talk contribs 49,281 bytes +30,450 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 13:1013:10, 29 November 2021DG Regio talk contribs 12,094 bytes +1,629 Created claim: summary (P836): Le projet comprend un certain nombre de tâches visant à moderniser le centre de santé de Neapolis situé dans l’unité régionale de Lakonia. De façon plus détaillée, les travaux suivants sont inclus: 1. Remplacement des cadres. 2. Isolation de toit et remplacement des tuiles. 3. Remplacement de la chaudière de chauffage existante. 4. Installation d’unités de climatisation pour le refroidissement-chauffage dans les salles d’examen et dans les es...
  • curprev 13:1013:10, 29 November 2021DG Regio talk contribs 10,465 bytes +123 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 18:2518:25, 2 July 2021DG Regio talk contribs 10,331 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 18:2518:25, 2 July 2021DG Regio talk contribs 10,209 bytes +1,477 Created claim: summary (P836): The project includes a series of works aimed at the functional upgrading of the Neapolis Health Centre located in the Regional Unit of Laconia. In more detail, the following tasks are included: 1. Replace frames. 2. Roof insulation and tile replacement. 3. Replacement of existing heating boiler. 4. Installation of air conditioning units for cooling-heating in examination rooms and in public areas. 5. It’s coloring. 6. Upgrading of weak curr...

30 June 2021

22 June 2021