Revision history of "Bypass of Arnea" (Q2782261)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 08:3208:32, 10 October 2024DG Regio talk contribs 41,625 bytes −3 Set a claim value: summary (P836): O projeto diz respeito à segunda fase da construção segmentada de um novo troço rodoviário para a variante de Arnea até ao município de Aristóteles, com uma extensão de 5,2 km, com uma faixa por direção e uma faixa de emergência (LEA) sem separação do tráfego. O projeto inclui também a construção de uma nova estrada de ligação com a estrada de 3 km de comprimento para Megali Panagia e a construção de 4 nós de tráfego de nível para ligar às estradas...

23 March 2024

12 June 2023

5 January 2023

11 July 2022

  • curprev 07:4807:48, 11 July 2022DG Regio talk contribs 41,397 bytes +24,819 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

16 December 2021

6 December 2021

29 November 2021

  • curprev 14:4414:44, 29 November 2021DG Regio talk contribs 10,979 bytes +1,365 Created claim: summary (P836): Le projet concerne la deuxième phase du projet de construction d’un nouveau tronçon routier d’une route nationale pour le contournement d’Arnaia dans la municipalité d’Aristote, d’une longueur de 5,2 km, avec une voie par direction et une bande d’urgence (LEA) sans séparation de la circulation. Le projet comprend également la construction d’une nouvelle route de raccordement avec la route de Megali Panagia de 3 km de long et la construction de 4...
  • curprev 14:4414:44, 29 November 2021DG Regio talk contribs 9,614 bytes +83 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 16:5316:53, 2 July 2021DG Regio talk contribs 9,520 bytes +74 Changed label, description and/or aliases in en: translated_label
  • curprev 16:5316:53, 2 July 2021DG Regio talk contribs 9,446 bytes +1,264 Created claim: summary (P836): The project concerns the second phase of the segmented construction of a new highway section for the Arnea bypass to the Municipality of Aristotle, with a length of 5.2 km, with one lane per direction and an Emergency Lane (LEA) without traffic separation. The project also includes the construction of a new connecting road with the 3 km long road to Megali Panagia and the construction of 4 level traffic nodes to connect to existing roads., trans...

30 June 2021

22 June 2021