Revision history of "Installation of signalling system and ETCS Level 1 at the single railway line Thessaloniki Idomeni (through the new variant at Polykastro Idomeni section) and replace 37 switches for signalling needs." (Q2778302)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 08:4208:42, 9 October 2024DG Regio talk contribs 43,006 bytes +12 Changed label, description and/or aliases in pt
  • curprev 08:4208:42, 9 October 2024DG Regio talk contribs 42,994 bytes −5 Set a claim value: summary (P836): No âmbito do projeto, será implementada a instalação do ETCS (Sistema Europeu de Controlo dos Comboios) de nível 1, a linha ferroviária única Salónica – Idomeni, a fim de maximizar a segurança do transporte ferroviário de passageiros e de mercadorias e cumprir os princípios da interoperabilidade.

20 March 2024

9 June 2023

5 January 2023

28 July 2022

  • curprev 11:5011:50, 28 July 2022DG Regio talk contribs 42,767 bytes +25,945 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 12:0612:06, 29 November 2021DG Regio talk contribs 11,154 bytes +1,148 Created claim: summary (P836): Dans le cadre du projet, l’installation d’un système ETCS (European Train Control System) de niveau 1 de la ligne ferroviaire unique Thessalonique — Idomeni sera mise en œuvre afin de maximiser la sécurité du transport ferroviaire de voyageurs et de marchandises et de respecter les principes d’interopérabilité., translated_summary
  • curprev 12:0612:06, 29 November 2021DG Regio talk contribs 10,006 bytes +307 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 16:5316:53, 2 July 2021DG Regio talk contribs 9,688 bytes +260 Changed label, description and/or aliases in en: translated_label
  • curprev 16:5316:53, 2 July 2021DG Regio talk contribs 9,428 bytes +1,121 Created claim: summary (P836): In the framework of the project, the installation of the ETCS (European Train Control System) Level 1, the single railway line Thessaloniki – Idomeni, will be implemented in order to maximise the safety of passenger and freight rail transport and to comply with the principles of Interoperability., translated_summary

30 June 2021

22 June 2021