Revision history of "REPLACEMENT OF EXISTING WATER PIPELINE BY SOURCES OF PIAN" (Q2777516)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 19:5219:52, 7 October 2024DG Regio talk contribs 61,878 bytes +1 Changed label, description and/or aliases in pt
  • curprev 19:5219:52, 7 October 2024DG Regio talk contribs 61,877 bytes +34 Set a claim value: summary (P836): O projeto diz respeito à substituição do gasoduto de abastecimento de água existente (rede externa) que transfere água das nascentes para a zona da comunidade local de Piana da unidade municipal de Falanthos do município de Trípoli, na «antiga» albufeira de Trípoli, por um novo gasoduto. O gasoduto existente é obsoleto, uma vez que foi construído em 1930 e o seu estado é mau. Catástrofes são detectadas em vários locais, seja devido a capturas ilegai...

12 March 2024

12 June 2023

5 January 2023

28 July 2022

  • curprev 11:4011:40, 28 July 2022DG Regio talk contribs 61,613 bytes +38,371 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 14,190 bytes +2,155 Created claim: summary (P836): Le projet concerne le remplacement du gazoduc d’approvisionnement en eau existant (réseau externe) qui transporte l’eau des sources jusqu’à la zone de la communauté locale de piano de l’unité municipale de Falanthos de la municipalité de Tripoli vers le «ancien» réservoir de Tripoli, par un nouveau gazoduc. Le pipeline existant est obsolète car il a été construit en 1930 et son état est médiocre. Les catastrophes sont identifiées à divers momen...
  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 12,035 bytes +149 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 11,875 bytes +116 Changed label, description and/or aliases in en: translated_label
  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 11,759 bytes +2,038 Created claim: summary (P836): The project concerns the replacement of the existing water supply pipeline (external network) which transfers water from the springs to the area of the Local Community of Piana of the Municipal Unity of Falanthos of the Municipality of Tripoli in the ‘old’ reservoir of Tripoli, with a new pipeline. The existing pipeline is obsolete as it was built in 1930 and its condition is poor. Catastrophes are detected at various locations, either because...

30 June 2021

22 June 2021