Revision history of "MAIN CONDUCTOR FOR THE WATER SUPPLY OF A CENTRAL DRY SETTLEMENT OF NORTH-WESTERN SEASIDE SEASIDE" (Q2777514)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

12 June 2023

5 January 2023

11 July 2022

  • curprev 07:1307:13, 11 July 2022DG Regio talk contribs 47,713 bytes +29,183 Changed label, description and/or aliases in da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, el, it, es, and other parts: Adding translations: da, hr, ro, sk, mt, pt, fi, pl, sl, cs, lt, lv, bg, hu, ga, sv, et,

15 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 12,020 bytes +1,508 Created claim: summary (P836): Le projet «Conduite de base pour l’approvisionnement en eau du réservoir central du village de Paralio Astros Municipalité de Kynouria Nord» concerne le remplacement/la construction de l’oléoduc externe d’approvisionnement en eau à partir du réservoir existant, situé au nord-ouest de l’agglomération d’Astros, jusqu’au nouveau réservoir de la colonie Paralio Astros, qui devrait être construit au nord de la colonie Paralio Astros, sur le site des...
  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 10,512 bytes +196 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 10,305 bytes +155 Changed label, description and/or aliases in en: translated_label
  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 10,150 bytes +1,471 Created claim: summary (P836): The project “Basic water supply pipeline for the central reservoir of the settlement of Paralios Astros Municipality of Northern Kynouria” concerns the replacement/construction of the external water supply pipeline from the existing reservoir, which is located north-west of the settlement of Astras, up to the new reservoir of the settlement of Paralios Astras, which is expected to be constructed north of the settlement of Paralios Astras, at the...

30 June 2021

22 June 2021