Revision history of "REPLACEMENT OF A WATER NETWORK IN THE MUNICIPAL COMMUNITY OF KALAMATA" (Q2777501)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

12 June 2023

5 January 2023

28 July 2022

  • curprev 11:3911:39, 28 July 2022DG Regio talk contribs 44,746 bytes +27,132 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 11,592 bytes +1,426 Created claim: summary (P836): Le projet concerne le remplacement d’anciens tuyaux en PVC dans la communauté municipale de Kalamata et d’une partie des tuyaux en fonte obsolètes du centre de la ville, avec des tuyaux en polyéthylène de 10 et 16 atm. La longueur totale des gazoducs à construire est de 26,487 km. De plus, le projet comprend des transferts d’approvisionnement en eau des anciens réseaux vers les nouveaux réseaux et toutes les connexions pour le bon fonctionnement...
  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 10,166 bytes +137 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 10,018 bytes +128 Changed label, description and/or aliases in en: translated_label
  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 9,890 bytes +1,365 Created claim: summary (P836): The project concerns the replacement of old PVC pipelines in the Municipal Community of Kalamata and part of the obsolete cast iron pipes in the city centre, with Polyethylene tubes 10 atm and 16 atm. The total length of the pipelines to be constructed is 26.487 km.In addition, the project includes transfers of water supplies from the old networks to the new networks and all connections for the proper operation of the new networks. The completio...

30 June 2021

22 June 2021