Revision history of "Improvement of the 7th existing median route (average sections)" (Q2777482)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

12 June 2023

5 January 2023

28 July 2022

  • curprev 11:3911:39, 28 July 2022DG Regio talk contribs 64,591 bytes +40,785 Changed label, description and/or aliases in et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, el, it, es, and other parts: Adding translations: et, lt, hr, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

15 January 2022

16 December 2021

5 December 2021

29 November 2021

  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 14,594 bytes +2,372 Created claim: summary (P836): L’opération comprend l’amélioration et la modernisation de la 7e unité régionale de la route provinciale de Messinie, d’une longueur totale de 8,410 km, avec une direction sud-nord dans les départements de Messini Eve et Eva Lampina. Le projet, du début à la fin, est construit sur la route existante. Plus précisément:A. Dans la section Messini Eve, l’intervention commence à partir de la contribution du nœud routier régional de Messini avec la 7e...
  • curprev 12:0012:00, 29 November 2021DG Regio talk contribs 12,222 bytes +124 Changed label, description and/or aliases in fr: translated_label

27 September 2021

5 July 2021

2 July 2021

  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 12,087 bytes +122 Changed label, description and/or aliases in en: translated_label
  • curprev 16:4616:46, 2 July 2021DG Regio talk contribs 11,965 bytes +2,159 Created claim: summary (P836): In practice, the improvement and upgrading of the 7th Provincial Road of the Regional Unit of Messinia with a total length of 8.410 km, heading from south to north, to the Messini Eva and Eva Labena sections. The project is constructed from beginning to end on the existing road. In particular:A. In Messina Eva the intervention starts from the confluence of the Node of the Regional Road of Messina with the 7th Provincial Road in C.T. 0+ 000, head...

30 June 2021

22 June 2021